Draft job list for first working party. Some longer-term items pruned as security, planning needed first etc.


Downstairs:

Floor scraping & sanding investigation Repair and de-sticky floor in workshop Build new front door

Extend door access control to front door
Fit CCTV - inside and forecourt.

Outside lighting

Install fire extinguishers, signage and alarms

Extend insurance if necessary Obscure windows Fix plug in pottery


Upstairs:


Tidy main table Hoover main area floor

Tidy workshop Hoover workshop with shopvac

Label bench PC plugs/monitors. Too much guessing is needed!

Bench PC 'Left' needs investigation, HDMI output is Very Wrong Bench PC 'Back' needs ... something. It now seems to fail to turn on at all, and may well need replacing with the incoming donated PC currently waiting next to it. Refer to Wiki for standard setup information.

Investigate state of donated monitors Assess/salvage remnants of the various old lights on table

Donated CNC needs more work.

We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required. Tile the kitchen wall above the sink Paint more of the ceiling - this is a condition of our lease.