October 6th Working Party

From ipswichmakerspace
Revision as of 21:49, 6 October 2018 by Areid (Talk | contribs)

Jump to: navigation, search

Priority Tasks

  • Sort and clean the workshop.
  • Sort out the corner by the door [part done]
  • Clean the kitchen
  • Clean the toilet
  • Hoover the main room floor</strike>
  • Sort out the electronic benches
  • Take rubbish to the tip [part done]
  • The Laser PSU needs properly attaching, and the new Air Assist Control System (TM) needs installing

Other Tasks

  • Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there.
  • Get the vinyl cutter working - some software has arrived, testing is needed.
  • The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports!
  • PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it.
  • Attach air conditioner outlet into Mr Laserducky's enclosure.
  • Patch up Woodzilla front pockets. They've split out from the frame at the base.
  • Swap front door camera.
  • Fix concerningly squeaky workshop hatch.</strike>
  • We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required.
  • Tile the kitchen wall above the sink
  • Paint more of the ceiling - this is a condition of our lease.