Difference between revisions of "Operating Committee Meeting 11/04/19"

From ipswichmakerspace
Jump to: navigation, search
(Meeting category added)
m
Line 43: Line 43:
 
Jason may have a newer container available after 6 months.
 
Jason may have a newer container available after 6 months.
  
[category:meeting]]
+
[[category:meeting]]

Revision as of 07:15, 12 April 2019

Agenda

  • Next working party (JL)
  • Lighting (MT)
  • Meeting Slot (JL)
  • Money handling (MT)

Notes

Tuesday 18:00 second week of month may move day depending on availability.

Inventory evening to be arranged by Aron.

Easter Saturday for next working party. May 4th next working party

  • Sort through things in "craft area"
  • Sort through things in store room
  • Move tools downstairs (add to inventory)
  • Move Palletron into storage room
  • Take things to tip
  • Painting downstairs
  • Tool organisation in the workshop
  • Proper bannister and handrail

Forging will be a day course activity led by an instructor. Instructor will have to stay behind to make sure the coals are safe. Noise isn't an immediate fine. A home made gas appliance wont be connected to the mains.

Aron has access to more woodworking tools, just need collecting from Norwich.

Adam has been offered a tour of the museum strong rooms. to be organised for the 11th May.

Matt to order some new lightbulbs.

Protocol for getting money is to use the money box in the locked cupboard and write purpose on the note. Aron to investigate the use of a card reader.

Match funding purchasing will take place after the ordering of heating and building materials

LORA group have offered us a Raspberry Pi based gateway. Will apply for a free one.

Jason may have a newer container available after 6 months.