Difference between revisions of "Planned Projects"

From ipswichmakerspace
Jump to: navigation, search
m
m
Line 13: Line 13:
 
| Active/Looking for volunteers
 
| Active/Looking for volunteers
 
| Stargate group. Steve, Martin, David, Adam, Jon, Mal
 
| Stargate group. Steve, Martin, David, Adam, Jon, Mal
|-
 
| Central heating
 
| Active
 
| Martin
 
| Pipe laying volunteers appreciated! Talk to Martin if you can help
 
 
|-
 
|-
 
| Open studio
 
| Open studio
Line 44: Line 39:
 
|-
 
|-
 
| [[Blacksmithing]] area
 
| [[Blacksmithing]] area
| Setup stage
+
| Setup stage (and back to some planning again)
 
| Adam, Aron, Matt et al
 
| Adam, Aron, Matt et al
| Flooring is being prepared, paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding.  
+
| Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding.  
 
|-
 
|-
 
| PI Wars
 
| PI Wars

Revision as of 20:17, 23 July 2019

The Ipswich Makerspace has a number of planned projects, which will be listed below.

In no particular order the current project include.

Project Status Leader/Contact Notes
Large scale Stargate Active/Looking for volunteers Stargate group. Steve, Martin, David, Adam, Jon, Mal
Open studio Complete Hannah
Metalworking Active Matt, Jason, Adam Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing.
MPCNC Planning & testing stage Jon/James CNC has now made some movements!!!. New route mount/dust shoe fitted (dust shoe in progress), but needs testing/tweaking
Lab/wetroom area Planning stage Adam et al In limbo until lasers moved to new location.
Pottery area Planning stage  ? Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time.
Blacksmithing area Setup stage (and back to some planning again) Adam, Aron, Matt et al Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding.
PI Wars Planning stage  ?
The Makerspace Open Day Planning stage/Sat 28th Sept 2019 Phil Call for makers posted 15/07