The Ipswich Makerspace has a number of planned projects, which will be listed below. | The Ipswich Makerspace has a number of planned projects, which will be listed below. | ||
+ | |||
+ | In no particular order the current project include. | ||
+ | |||
+ | {| class="wikitable" | ||
+ | |- | ||
+ | ! Project | ||
+ | ! Status | ||
+ | ! Leader/Contact | ||
+ | ! Notes | ||
+ | |- | ||
+ | | Large scale Stargate | ||
+ | | Active/Looking for volunteers | ||
+ | | Stargate group. Steve, Martin, David, Adam, Jon, Mal | ||
+ | |- | ||
+ | | <s>Open studio</s> | ||
+ | | <s>Complete</s> | ||
+ | | <s>Hannah</s> | ||
+ | |- | ||
+ | | Metalworking | ||
+ | | Active | ||
+ | | Matt, Jason, Adam | ||
+ | | Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing. | ||
+ | |- | ||
+ | | <s>MPCNC [[CNC]]</s> | ||
+ | | <s>Complete</s> | ||
+ | | <s>Jon/James</s> | ||
+ | | '''CNC works and is being used, if you would like to use the CNC please speak to Jon or James for advise on the software and tool pathing.''' | ||
+ | |- | ||
+ | | Lab/wetroom area | ||
+ | | Planning stage | ||
+ | | Adam et al | ||
+ | | In limbo until lasers moved to new location. | ||
+ | |- | ||
+ | | Pottery area | ||
+ | | Planning stage | ||
+ | | ? | ||
+ | | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time. | ||
+ | |- | ||
+ | | [[Blacksmithing]] area | ||
+ | | Setup stage (and back to some planning again) | ||
+ | | Adam, Aron, Matt et al | ||
+ | | Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding. | ||
+ | |- | ||
+ | | [[Pi Wars 2020]] | ||
+ | | Planning stage | ||
+ | | ? | ||
+ | | Planning meeting 10/10/2019, info to follow. | ||
+ | |- | ||
+ | | <s>The Makerspace Open Day</s> | ||
+ | | <s>Planning stage/Sat 28th Sept 2019</s> | ||
+ | | <s>Phil</s> | ||
+ | | | ||
+ | |- | ||
+ | | Large laser bed | ||
+ | | Motor replacement has arrived. Waiting on new bed | ||
+ | | Matt, Ben and David | ||
+ | | | ||
+ | |} |
Latest revision as of 12:34, 10 October 2019
The Ipswich Makerspace has a number of planned projects, which will be listed below.
In no particular order the current project include.
Project | Status | Leader/Contact | Notes |
---|---|---|---|
Large scale Stargate | Active/Looking for volunteers | Stargate group. Steve, Martin, David, Adam, Jon, Mal | |
|
|
| |
Metalworking | Active | Matt, Jason, Adam | Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing. |
|
|
|
CNC works and is being used, if you would like to use the CNC please speak to Jon or James for advise on the software and tool pathing. |
Lab/wetroom area | Planning stage | Adam et al | In limbo until lasers moved to new location. |
Pottery area | Planning stage | ? | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time. |
Blacksmithing area | Setup stage (and back to some planning again) | Adam, Aron, Matt et al | Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding. |
Pi Wars 2020 | Planning stage | ? | Planning meeting 10/10/2019, info to follow. |
|
|
|
|
Large laser bed | Motor replacement has arrived. Waiting on new bed | Matt, Ben and David |