| Stargate group. Steve, Martin, David, Adam, Jon, Mal | | Stargate group. Steve, Martin, David, Adam, Jon, Mal | ||
|- | |- | ||
− | | | + | | <s>Open studio</s> |
− | + | | <s>Complete</s> | |
− | + | | <s>Hannah</s> | |
− | + | ||
− | + | ||
− | + | ||
− | | Complete | + | |
− | | Hannah | + | |
|- | |- | ||
| Metalworking | | Metalworking | ||
Line 28: | Line 23: | ||
| Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing. | | Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing. | ||
|- | |- | ||
− | | MPCNC | + | | <s>MPCNC [[CNC]]</s> |
− | | | + | | <s>Complete</s> |
− | | Jon/James | + | | <s>Jon/James</s> |
− | | CNC | + | | '''CNC works and is being used, if you would like to use the CNC please speak to Jon or James for advise on the software and tool pathing.''' |
|- | |- | ||
| Lab/wetroom area | | Lab/wetroom area | ||
Line 43: | Line 38: | ||
| Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time. | | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time. | ||
|- | |- | ||
− | | Blacksmithing area | + | | [[Blacksmithing]] area |
− | | Setup stage | + | | Setup stage (and back to some planning again) |
| Adam, Aron, Matt et al | | Adam, Aron, Matt et al | ||
− | | Flooring is being prepared | + | | Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding. |
|- | |- | ||
− | | | + | | [[Pi Wars 2020]] |
| Planning stage | | Planning stage | ||
| ? | | ? | ||
− | | | + | | Planning meeting 10/10/2019, info to follow. |
|- | |- | ||
− | | The Makerspace Open Day | + | | <s>The Makerspace Open Day</s> |
− | | Planning stage/Sat 28th Sept 2019 | + | | <s>Planning stage/Sat 28th Sept 2019</s> |
− | | Phil | + | | <s>Phil</s> |
− | | | + | | |
+ | |- | ||
+ | | Large laser bed | ||
+ | | Motor replacement has arrived. Waiting on new bed | ||
+ | | Matt, Ben and David | ||
+ | | | ||
|} | |} |
Latest revision as of 12:34, 10 October 2019
The Ipswich Makerspace has a number of planned projects, which will be listed below.
In no particular order the current project include.
Project | Status | Leader/Contact | Notes |
---|---|---|---|
Large scale Stargate | Active/Looking for volunteers | Stargate group. Steve, Martin, David, Adam, Jon, Mal | |
|
|
| |
Metalworking | Active | Matt, Jason, Adam | Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing. |
|
|
|
CNC works and is being used, if you would like to use the CNC please speak to Jon or James for advise on the software and tool pathing. |
Lab/wetroom area | Planning stage | Adam et al | In limbo until lasers moved to new location. |
Pottery area | Planning stage | ? | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time. |
Blacksmithing area | Setup stage (and back to some planning again) | Adam, Aron, Matt et al | Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding. |
Pi Wars 2020 | Planning stage | ? | Planning meeting 10/10/2019, info to follow. |
|
|
|
|
Large laser bed | Motor replacement has arrived. Waiting on new bed | Matt, Ben and David |