Difference between revisions of "October 6th Working Party"
From ipswichmakerspace
m |
m (→Other Tasks) |
||
(One intermediate revision by the same user not shown) | |||
Line 5: | Line 5: | ||
* <strike>Clean the kitchen</strike> | * <strike>Clean the kitchen</strike> | ||
* <strike>Clean the toilet</strike> | * <strike>Clean the toilet</strike> | ||
− | * Hoover the main room floor</strike> | + | * <strike>Hoover the main room floor</strike> |
* <strike>Sort out the electronic benches</strike> | * <strike>Sort out the electronic benches</strike> | ||
* Take rubbish to the tip [part done] | * Take rubbish to the tip [part done] | ||
Line 19: | Line 19: | ||
* <strike>Patch up Woodzilla front pockets. They've split out from the frame at the base.</strike> | * <strike>Patch up Woodzilla front pockets. They've split out from the frame at the base.</strike> | ||
* Swap front door camera. | * Swap front door camera. | ||
− | * Fix concerningly squeaky workshop hatch.</strike> | + | * <strike>Fix concerningly squeaky workshop hatch.</strike> |
+ | * <strike>Fix leaky Turnigy extruder</strike> | ||
* We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required. | * We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required. | ||
* Tile the kitchen wall above the sink | * Tile the kitchen wall above the sink | ||
* Paint more of the ceiling - this is a condition of our lease. | * Paint more of the ceiling - this is a condition of our lease. |
Latest revision as of 21:03, 6 October 2018
Priority Tasks
-
Sort and clean the workshop. - Sort out the corner by the door [part done]
-
Clean the kitchen -
Clean the toilet -
Hoover the main room floor -
Sort out the electronic benches - Take rubbish to the tip [part done]
-
The Laser PSU needs properly attaching, and the new Air Assist Control System (TM) needs installing
Other Tasks
- Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there.
-
Get the vinyl cutter working - some software has arrived, testing is needed. - The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports!
- PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it.
-
Attach air conditioner outlet into Mr Laserducky's enclosure. -
Patch up Woodzilla front pockets. They've split out from the frame at the base. - Swap front door camera.
-
Fix concerningly squeaky workshop hatch. -
Fix leaky Turnigy extruder - We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required.
- Tile the kitchen wall above the sink
- Paint more of the ceiling - this is a condition of our lease.