Difference between revisions of "January 12th Working Party"
From ipswichmakerspace
(Created page with "Draft job list for first working party. Some longer-term items pruned as security, planning needed first etc. Downstairs: Floor scraping & sanding investigation Repair and...") |
m |
||
(6 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
− | Downstairs | + | ===Downstairs=== |
− | Floor scraping & sanding investigation | + | *Floor scraping & sanding investigation |
− | Repair and de-sticky floor in workshop | + | *Repair and de-sticky floor in workshop |
− | Build new front door | + | *Build new front door |
− | + | *Fit forecourt CCTV. | |
− | + | *Outside lighting | |
− | Outside lighting | + | *Extend insurance if necessary |
− | + | *Obscure windows | |
− | Extend insurance if necessary | + | *Fix plug in pottery |
− | Obscure windows | + | *Assess & (hopefully improve) shipping container ventilation |
− | Fix plug in pottery | + | |
+ | ===Upstairs=== | ||
− | + | *Tidy main table | |
+ | *Hoover main area floor | ||
+ | *Tidy workshop | ||
+ | *Hoover workshop with shopvac | ||
− | + | *Label bench PC plugs/monitors. Too much guessing is needed! | |
− | + | ||
− | + | *Bench PC 'Left' needs investigation, HDMI output is Very Wrong | |
− | + | *Bench PC 'Back' needs ... something. It now seems to fail to turn on at all, and may well need replacing with the incoming donated PC currently waiting next to it. Refer to Wiki for standard setup information. | |
− | + | *Selene is due a lens cleaning and realignment session | |
+ | *Investigate state of donated monitors | ||
+ | *Assess/salvage remnants of the various old lights on table | ||
+ | *Fix/replace LED in left side door switch | ||
− | + | *Donated CNC needs more work. | |
− | + | ||
− | + | *We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required. | |
− | + | *Tile the kitchen wall above the sink | |
− | + | *Paint more of the ceiling - this is a condition of our lease. | |
− | + | ||
− | + | ||
− | We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required. | + | |
− | Tile the kitchen wall above the sink | + | |
− | Paint more of the ceiling - this is a condition of our lease. | + |
Latest revision as of 12:35, 10 January 2019
Draft job list for first working party. Some longer-term items pruned as security, planning needed first etc.
Downstairs
- Floor scraping & sanding investigation
- Repair and de-sticky floor in workshop
- Build new front door
- Fit forecourt CCTV.
- Outside lighting
- Extend insurance if necessary
- Obscure windows
- Fix plug in pottery
- Assess & (hopefully improve) shipping container ventilation
Upstairs
- Tidy main table
- Hoover main area floor
- Tidy workshop
- Hoover workshop with shopvac
- Label bench PC plugs/monitors. Too much guessing is needed!
- Bench PC 'Left' needs investigation, HDMI output is Very Wrong
- Bench PC 'Back' needs ... something. It now seems to fail to turn on at all, and may well need replacing with the incoming donated PC currently waiting next to it. Refer to Wiki for standard setup information.
- Selene is due a lens cleaning and realignment session
- Investigate state of donated monitors
- Assess/salvage remnants of the various old lights on table
- Fix/replace LED in left side door switch
- Donated CNC needs more work.
- We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required.
- Tile the kitchen wall above the sink
- Paint more of the ceiling - this is a condition of our lease.