Difference between revisions of "Planned Projects"
From ipswichmakerspace
m |
m |
||
Line 13: | Line 13: | ||
| Active/Looking for volunteers | | Active/Looking for volunteers | ||
| Stargate group. Steve, Martin, David, Adam, Jon, Mal | | Stargate group. Steve, Martin, David, Adam, Jon, Mal | ||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| Open studio | | Open studio | ||
Line 44: | Line 39: | ||
|- | |- | ||
| [[Blacksmithing]] area | | [[Blacksmithing]] area | ||
− | | Setup stage | + | | Setup stage (and back to some planning again) |
| Adam, Aron, Matt et al | | Adam, Aron, Matt et al | ||
− | | Flooring is being prepared | + | | Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding. |
|- | |- | ||
| PI Wars | | PI Wars |
Revision as of 20:17, 23 July 2019
The Ipswich Makerspace has a number of planned projects, which will be listed below.
In no particular order the current project include.
Project | Status | Leader/Contact | Notes |
---|---|---|---|
Large scale Stargate | Active/Looking for volunteers | Stargate group. Steve, Martin, David, Adam, Jon, Mal | |
Open studio | Complete | Hannah | |
Metalworking | Active | Matt, Jason, Adam | Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing. |
MPCNC | Planning & testing stage | Jon/James | CNC has now made some movements!!!. New route mount/dust shoe fitted (dust shoe in progress), but needs testing/tweaking |
Lab/wetroom area | Planning stage | Adam et al | In limbo until lasers moved to new location. |
Pottery area | Planning stage | ? | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time. |
Blacksmithing area | Setup stage (and back to some planning again) | Adam, Aron, Matt et al | Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding. |
PI Wars | Planning stage | ? | |
The Makerspace Open Day | Planning stage/Sat 28th Sept 2019 | Phil | Call for makers posted 15/07 |