Difference between revisions of "Planned Projects"

From ipswichmakerspace
Jump to: navigation, search
m
 
(7 intermediate revisions by 3 users not shown)
Line 14: Line 14:
 
| Stargate group. Steve, Martin, David, Adam, Jon, Mal
 
| Stargate group. Steve, Martin, David, Adam, Jon, Mal
 
|-
 
|-
| Central heating
+
| <s>Open studio</s>
| Active
+
| <s>Complete</s>
| Martin
+
| <s>Hannah</s>
| Pipe laying volunteers appreciated! Talk to Martin if you can help
+
|-
+
| Open studio
+
| Complete
+
| Hannah
+
 
|-
 
|-
 
| Metalworking
 
| Metalworking
Line 28: Line 23:
 
| Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing.
 
| Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing.
 
|-
 
|-
| MPCNC
+
| <s>MPCNC [[CNC]]</s>
| Planning & testing stage
+
| <s>Complete</s>
| Jon/James
+
| <s>Jon/James</s>
| CNC has now made some movements!!!. New route mount/dust shoe fitted (dust shoe in progress), but needs testing/tweaking
+
| '''CNC works and is being used, if you would like to use the CNC please speak to Jon or James for advise on the software and tool pathing.'''
 
|-
 
|-
 
| Lab/wetroom area
 
| Lab/wetroom area
Line 44: Line 39:
 
|-
 
|-
 
| [[Blacksmithing]] area
 
| [[Blacksmithing]] area
| Setup stage
+
| Setup stage (and back to some planning again)
 
| Adam, Aron, Matt et al
 
| Adam, Aron, Matt et al
| Flooring is being prepared, paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding.  
+
| Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding.  
 
|-
 
|-
| PI Wars
+
| [[Pi Wars 2020]]
 
| Planning stage
 
| Planning stage
 
| ?
 
| ?
|
+
| Planning meeting 10/10/2019, info to follow.
 
|-
 
|-
| The Makerspace Open Day
+
| <s>The Makerspace Open Day</s>
| Planning stage/Sat 28th Sept 2019
+
| <s>Planning stage/Sat 28th Sept 2019</s>
| Phil
+
| <s>Phil</s>
| Call for makers posted 15/07
+
|
 +
|-
 +
| Large laser bed
 +
| Motor replacement has arrived. Waiting on new bed
 +
| Matt, Ben and David
 +
|
 
|}
 
|}

Latest revision as of 12:34, 10 October 2019

The Ipswich Makerspace has a number of planned projects, which will be listed below.

In no particular order the current project include.

Project Status Leader/Contact Notes
Large scale Stargate Active/Looking for volunteers Stargate group. Steve, Martin, David, Adam, Jon, Mal
Open studio Complete Hannah
Metalworking Active Matt, Jason, Adam Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing.
MPCNC CNC Complete Jon/James CNC works and is being used, if you would like to use the CNC please speak to Jon or James for advise on the software and tool pathing.
Lab/wetroom area Planning stage Adam et al In limbo until lasers moved to new location.
Pottery area Planning stage  ? Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time.
Blacksmithing area Setup stage (and back to some planning again) Adam, Aron, Matt et al Flooring is being prepared. Paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding.
Pi Wars 2020 Planning stage  ? Planning meeting 10/10/2019, info to follow.
The Makerspace Open Day Planning stage/Sat 28th Sept 2019 Phil
Large laser bed Motor replacement has arrived. Waiting on new bed Matt, Ben and David