Difference between revisions of "Operating Committee Meeting 12/11/19"
From ipswichmakerspace
m (Leachj moved page Operating Committee Meeting 05/11/19 to Operating Committee Meeting 12/11/19: Moving to the correct day) |
|||
(6 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | + | == Agenda == | |
− | + | ||
− | + | General Finance health | |
+ | - Member growth, expenses etc | ||
+ | - Can OC do more to help ensure our future ? | ||
+ | |||
+ | FB Poll Analysis | ||
+ | - Adam has the analysis | ||
+ | |||
+ | Suggestion / Feedback Box | ||
+ | - Anon feedback might be useful | ||
+ | |||
+ | Downstairs areas usage | ||
+ | - are we getting the most out of the "Dance Floor" ? | ||
+ | - where to setup metal work / separate from wood work ? | ||
+ | |||
+ | Guest WiFi | ||
+ | - Feedback? | ||
+ | |||
+ | Next working party | ||
+ | |||
+ | == Notes == | ||
+ | |||
+ | * Attendees: MT, AL, JW, JL, PW | ||
+ | |||
+ | * Would be good to have some sort of graph about how we are doing with money. | ||
+ | * The downstairs space is not that utilised. Could the function room be used for an extension of the workshop space. | ||
+ | * Our recommendation for downstairs | ||
+ | ** Function room - folding tables down one side, CNC machine, workshop extension. Equipment should all be moveable. | ||
+ | ** Front room - 3D printers, PC workstations. move member storage from upstairs to downstairs. make a desk for computers. | ||
+ | ** Workshop - metalworking is staying in the same area, need to plan the benches and machine locations. build a partition wall to separate. | ||
+ | * We need to remind people selling things about the 10%. | ||
+ | * To progress the blacksmithing - JW brother to look over proposal, conduct some tests on noise, research planning restrictions. | ||
+ | * Guest wifi is working well, we should change the password for the members wifi. | ||
+ | * CCTV ongoing. | ||
+ | |||
+ | |||
+ | Actions: | ||
+ | |||
+ | * JL talk to Steve about the bench. | ||
+ | * DA to chase ben about the laser bed. | ||
+ | * MT and AL to look at laser training and documentation. | ||
+ | * 21st planning meeting for working party. | ||
+ | * 30th November - next working party. | ||
+ | * JW brother to look over blacksmithing proposal. | ||
+ | * AL to make a suggestion box. | ||
+ | * JL claim ownership of facebook page. | ||
+ | * JL to open up membership system. | ||
+ | * AL and JL to advertise laser workshop. | ||
+ | * PW to work on Makerspace app. | ||
+ | * MT to add instagram and calendar to website. | ||
+ | * MT to advertise Christmas party. |
Latest revision as of 20:48, 12 November 2019
Agenda
General Finance health
- Member growth, expenses etc - Can OC do more to help ensure our future ?
FB Poll Analysis - Adam has the analysis
Suggestion / Feedback Box - Anon feedback might be useful
Downstairs areas usage - are we getting the most out of the "Dance Floor" ? - where to setup metal work / separate from wood work ?
Guest WiFi - Feedback?
Next working party
Notes
- Attendees: MT, AL, JW, JL, PW
- Would be good to have some sort of graph about how we are doing with money.
- The downstairs space is not that utilised. Could the function room be used for an extension of the workshop space.
- Our recommendation for downstairs
- Function room - folding tables down one side, CNC machine, workshop extension. Equipment should all be moveable.
- Front room - 3D printers, PC workstations. move member storage from upstairs to downstairs. make a desk for computers.
- Workshop - metalworking is staying in the same area, need to plan the benches and machine locations. build a partition wall to separate.
- We need to remind people selling things about the 10%.
- To progress the blacksmithing - JW brother to look over proposal, conduct some tests on noise, research planning restrictions.
- Guest wifi is working well, we should change the password for the members wifi.
- CCTV ongoing.
Actions:
- JL talk to Steve about the bench.
- DA to chase ben about the laser bed.
- MT and AL to look at laser training and documentation.
- 21st planning meeting for working party.
- 30th November - next working party.
- JW brother to look over blacksmithing proposal.
- AL to make a suggestion box.
- JL claim ownership of facebook page.
- JL to open up membership system.
- AL and JL to advertise laser workshop.
- PW to work on Makerspace app.
- MT to add instagram and calendar to website.
- MT to advertise Christmas party.