Difference between revisions of "October 6th Working Party"
From ipswichmakerspace
Line 1: | Line 1: | ||
− | == | + | ==Priority Tasks== |
− | + | ||
* Sort and clean the workshop. | * Sort and clean the workshop. | ||
* Sort out the corner by the door | * Sort out the corner by the door | ||
− | * | + | * Clean the kitchen |
− | * | + | * Clean the toilet |
− | * | + | * Hoover the main room floor |
− | * | + | * Sort out the electronic benches |
+ | * Take rubbish to the tip | ||
+ | * The Laser PSU needs properly attaching, and the new Air Assist Control System (TM) needs installing | ||
− | + | ==Other Tasks== | |
− | == | + | |
* Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there. | * Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there. | ||
Line 16: | Line 16: | ||
* The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports! | * The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports! | ||
* PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it. | * PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it. | ||
− | |||
* Attach air conditioner outlet into Mr Laserducky's enclosure. | * Attach air conditioner outlet into Mr Laserducky's enclosure. | ||
* Patch up Woodzilla front pockets. They've split out from the frame at the base. | * Patch up Woodzilla front pockets. They've split out from the frame at the base. | ||
Line 22: | Line 21: | ||
* Fix concerningly squeaky workshop hatch. | * Fix concerningly squeaky workshop hatch. | ||
* We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required. | * We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required. | ||
+ | * Tile the kitchen wall above the sink | ||
+ | * Paint more of the ceiling - this is a condition of our lease. |
Revision as of 20:06, 4 October 2018
Priority Tasks
- Sort and clean the workshop.
- Sort out the corner by the door
- Clean the kitchen
- Clean the toilet
- Hoover the main room floor
- Sort out the electronic benches
- Take rubbish to the tip
- The Laser PSU needs properly attaching, and the new Air Assist Control System (TM) needs installing
Other Tasks
- Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there.
- Get the vinyl cutter working - some software has arrived, testing is needed.
- The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports!
- PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it.
- Attach air conditioner outlet into Mr Laserducky's enclosure.
- Patch up Woodzilla front pockets. They've split out from the frame at the base.
- Swap front door camera.
- Fix concerningly squeaky workshop hatch.
- We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required.
- Tile the kitchen wall above the sink
- Paint more of the ceiling - this is a condition of our lease.