==Major Tasks==
+
==Priority Tasks==
 
+
  
 
* Sort and clean the workshop.
 
* Sort and clean the workshop.
 
* Sort out the corner by the door
 
* Sort out the corner by the door
* Paint the stairs with the extra-grip paint
+
* Clean the kitchen
* We also need to paint more of the ceiling. We have extendable rollers and pogo sticks; choose your weapon wisely.
+
* Clean the toilet
* Tidy up. Some PR photos of the place then looking sensible would be useful too
+
* Hoover the main room floor
* Tile the kitchen wall above the sink
+
* Sort out the electronic benches
 +
* Take rubbish to the tip
 +
* The Laser PSU needs properly attaching, and the new Air Assist Control System (TM) needs installing
  
 
+
==Other Tasks==
==Lesser Tasks==
+
  
 
* Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there.
 
* Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there.
Line 16: Line 16:
 
* The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports!
 
* The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports!
 
* PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it.
 
* PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it.
* The Laser PSU needs properly attaching, and the new Air Assist Control System (TM) needs installing
 
 
* Attach air conditioner outlet into Mr Laserducky's enclosure.
 
* Attach air conditioner outlet into Mr Laserducky's enclosure.
 
* Patch up Woodzilla front pockets. They've split out from the frame at the base.
 
* Patch up Woodzilla front pockets. They've split out from the frame at the base.
Line 22: Line 21:
 
* Fix concerningly squeaky workshop hatch.
 
* Fix concerningly squeaky workshop hatch.
 
* We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required.
 
* We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required.
 +
* Tile the kitchen wall above the sink
 +
* Paint more of the ceiling - this is a condition of our lease.

Revision as of 20:06, 4 October 2018

Priority Tasks

  • Sort and clean the workshop.
  • Sort out the corner by the door
  • Clean the kitchen
  • Clean the toilet
  • Hoover the main room floor
  • Sort out the electronic benches
  • Take rubbish to the tip
  • The Laser PSU needs properly attaching, and the new Air Assist Control System (TM) needs installing

Other Tasks

  • Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there.
  • Get the vinyl cutter working - some software has arrived, testing is needed.
  • The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports!
  • PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it.
  • Attach air conditioner outlet into Mr Laserducky's enclosure.
  • Patch up Woodzilla front pockets. They've split out from the frame at the base.
  • Swap front door camera.
  • Fix concerningly squeaky workshop hatch.
  • We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required.
  • Tile the kitchen wall above the sink
  • Paint more of the ceiling - this is a condition of our lease.