Difference between revisions of "Operating Committee Meeting 13/08/19"
From ipswichmakerspace
m (→Agenda) |
m |
||
Line 10: | Line 10: | ||
** This list is also needed as a comparative guide to further help define 'dangerous' | ** This list is also needed as a comparative guide to further help define 'dangerous' | ||
− | + | * Still no firm response re planer/thicknesser situation. Is plan still to sell ours and use Philips better one? | |
* Workshop sander area needs dust extraction setting up | * Workshop sander area needs dust extraction setting up | ||
* Workshop 'pipe fan' needs investigation, what did Sheep leave in there and can we use it? | * Workshop 'pipe fan' needs investigation, what did Sheep leave in there and can we use it? |
Revision as of 15:17, 9 August 2019
Agenda
- Policy for new equipment and loans
- Maintenance and liability. Issue a receipt for equipment loans?
- How to identify 'dangerous' equipment empirically, and what are the Risk Assessment requirements for such?
- Especially what rules are required for 'visiting' equipment vs long-term loaning/new? Is a generic RA possible?
- What current equipment meets the above 'dangerous' standard and who is going to assess it?
- This list is also needed as a comparative guide to further help define 'dangerous'
- Still no firm response re planer/thicknesser situation. Is plan still to sell ours and use Philips better one?
- Workshop sander area needs dust extraction setting up
- Workshop 'pipe fan' needs investigation, what did Sheep leave in there and can we use it?
- Wood lathe keeps stalling/slow-moding despite best efforts, and the belt is heavily wearing. Can the motor mount be moved to prevent this?
- Next working party (JL) moved down as some of the above may feature in it, so discussion should be had first