Difference between revisions of "Planned Projects"
From ipswichmakerspace
m |
|||
Line 12: | Line 12: | ||
| Large scale Stargate | | Large scale Stargate | ||
| Active/Looking for volunteers | | Active/Looking for volunteers | ||
− | | Steve | + | | Stargate group. Steve, Martin, David, Adam, Jon, Mal |
|- | |- | ||
| Central heating | | Central heating | ||
| Active | | Active | ||
| Martin | | Martin | ||
+ | | Pipe laying volunteers appreciated! Talk to Martin if you can help | ||
|- | |- | ||
− | | Open studio | + | | Open studio |
− | | Active | + | | Active |
| Hannah | | Hannah | ||
|- | |- | ||
| MPCNC | | MPCNC | ||
− | | Planning stage | + | | Planning & testing stage |
| Jon/James | | Jon/James | ||
| CNC has now made some movements!!!. New route mount/dust shoe fitted, but needs testing/tweaking | | CNC has now made some movements!!!. New route mount/dust shoe fitted, but needs testing/tweaking | ||
|- | |- | ||
− | | | + | | Lab area |
| Planning stage | | Planning stage | ||
− | | | + | | Adam et al |
+ | | In limbo until lasers moved to new location. | ||
|- | |- | ||
| Pottery area | | Pottery area | ||
| Planning stage | | Planning stage | ||
| ? | | ? | ||
+ | | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln, sources have appeared and disappeared so another will rise in time. | ||
|- | |- | ||
| Blacksmithing area | | Blacksmithing area | ||
− | | | + | | Setup stage |
− | | | + | | Adam, Aron, Matt mainly |
+ | | Flooring is being prepared, paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding. | ||
|- | |- | ||
| PI Wars | | PI Wars |
Revision as of 14:15, 29 June 2019
The Ipswich Makerspace has a number of planned projects, which will be listed below.
In no particular order the current project include.
Project | Status | Leader/Contact | Notes |
---|---|---|---|
Large scale Stargate | Active/Looking for volunteers | Stargate group. Steve, Martin, David, Adam, Jon, Mal | |
Central heating | Active | Martin | Pipe laying volunteers appreciated! Talk to Martin if you can help |
Open studio | Active | Hannah | |
MPCNC | Planning & testing stage | Jon/James | CNC has now made some movements!!!. New route mount/dust shoe fitted, but needs testing/tweaking |
Lab area | Planning stage | Adam et al | In limbo until lasers moved to new location. |
Pottery area | Planning stage | ? | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln, sources have appeared and disappeared so another will rise in time. |
Blacksmithing area | Setup stage | Adam, Aron, Matt mainly | Flooring is being prepared, paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding. |
PI Wars | Planning stage | ? |