Line 33: | Line 33: | ||
| CNC has now made some movements!!!. New route mount/dust shoe fitted, but needs testing/tweaking | | CNC has now made some movements!!!. New route mount/dust shoe fitted, but needs testing/tweaking | ||
|- | |- | ||
− | | Lab area | + | | Lab/wetroom area |
| Planning stage | | Planning stage | ||
| Adam et al | | Adam et al | ||
Line 41: | Line 41: | ||
| Planning stage | | Planning stage | ||
| ? | | ? | ||
− | | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln | + | | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time. |
|- | |- | ||
| Blacksmithing area | | Blacksmithing area |
Revision as of 14:24, 29 June 2019
The Ipswich Makerspace has a number of planned projects, which will be listed below.
In no particular order the current project include.
Project | Status | Leader/Contact | Notes |
---|---|---|---|
Large scale Stargate | Active/Looking for volunteers | Stargate group. Steve, Martin, David, Adam, Jon, Mal | |
Central heating | Active | Martin | Pipe laying volunteers appreciated! Talk to Martin if you can help |
Open studio | Active | Hannah | |
Metalworking | Active | Matt, Jason, Adam | Awaiting worktables currently, then lathe needs the motor mounting, and the other tools need securing. |
MPCNC | Planning & testing stage | Jon/James | CNC has now made some movements!!!. New route mount/dust shoe fitted, but needs testing/tweaking |
Lab/wetroom area | Planning stage | Adam et al | In limbo until lasers moved to new location. |
Pottery area | Planning stage | ? | Awaiting flooring before worktables can be thought about. Wheel needed, as is a kiln; sources have appeared and disappeared so another will rise in time. |
Blacksmithing area | Setup stage | Adam, Aron, Matt et al | Flooring is being prepared, paperwork awaiting feedback so the remaining materials Adam needs to build the propane forge can be ordered. Hood pending for the charcoal forge, along with a bit of repair and welding. |
PI Wars | Planning stage | ? |