Draft job list for first working party. Some longer-term items pruned as security, planning needed first etc.
Downstairs:
Floor scraping & sanding investigation Repair and de-sticky floor in workshop Build new front door
Extend door access control to front door Fit CCTV - inside and forecourt.
Outside lighting
Install fire extinguishers, signage and alarms
Extend insurance if necessary Obscure windows Fix plug in pottery
Upstairs:
Tidy main table
Hoover main area floor
Tidy workshop Hoover workshop with shopvac
Label bench PC plugs/monitors. Too much guessing is needed!
Bench PC 'Left' needs investigation, HDMI output is Very Wrong Bench PC 'Back' needs ... something. It now seems to fail to turn on at all, and may well need replacing with the incoming donated PC currently waiting next to it. Refer to Wiki for standard setup information.
Investigate state of donated monitors Assess/salvage remnants of the various old lights on table
Donated CNC needs more work.
We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required. Tile the kitchen wall above the sink Paint more of the ceiling - this is a condition of our lease.