October 6th Working Party
From ipswichmakerspace
Major Tasks
- Sort and clean the workshop.
- Sort out the corner by the door
- Paint the stairs with the extra-grip paint
- We also need to paint more of the ceiling. We have extendable rollers and pogo sticks; choose your weapon wisely.
- Tidy up. Some PR photos of the place then looking sensible would be useful too
- Tile the kitchen wall above the sink
Lesser Tasks
- Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there.
- Get the vinyl cutter working - some software has arrived, testing is needed.
- The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports!
- PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it.
- The Laser PSU needs properly attaching, and the new Air Assist Control System (TM) needs installing
- Attach air conditioner outlet into Mr Laserducky's enclosure.
- Patch up Woodzilla front pockets. They've split out from the frame at the base.
- Swap front door camera.
- Fix concerningly squeaky workshop hatch.
- We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required.