October 6th Working Party
From ipswichmakerspace
Priority Tasks
-
Sort and clean the workshop. - Sort out the corner by the door [part done]
-
Clean the kitchen -
Clean the toilet -
Hoover the main room floor -
Sort out the electronic benches - Take rubbish to the tip [part done]
-
The Laser PSU needs properly attaching, and the new Air Assist Control System (TM) needs installing
Other Tasks
- Set up a network shared folder. Common software, learning resources, and other critical stuff (like games) could live there.
-
Get the vinyl cutter working - some software has arrived, testing is needed. - The PCs need some tinkering again; PC3/Centre (nearest grey cupboard) seems to only output VGA (or the monitor ignores DVI). It might be a BIOS setting issue; ignore the top graphics ports!
- PC2/Back (middle of the 3 PCs) seems to overscan; likely either graphics settings or monitor issue, but nothing obvious. DVI use may fix it.
-
Attach air conditioner outlet into Mr Laserducky's enclosure. -
Patch up Woodzilla front pockets. They've split out from the frame at the base. - Swap front door camera.
-
Fix concerningly squeaky workshop hatch. -
Fix leaky Turnigy extruder - We've had some donations of Misc Stuff In Boxes. Currently at the top right of Palletron, they need sorting and curating/defenestrating as required.
- Tile the kitchen wall above the sink
- Paint more of the ceiling - this is a condition of our lease.