Operating Committee Meeting 13/08/19

From ipswichmakerspace
Revision as of 15:17, 9 August 2019 by Areid (Talk | contribs)

Jump to: navigation, search

Agenda

  • Policy for new equipment and loans
    • Maintenance and liability. Issue a receipt for equipment loans?
    • How to identify 'dangerous' equipment empirically, and what are the Risk Assessment requirements for such?
    • Especially what rules are required for 'visiting' equipment vs long-term loaning/new? Is a generic RA possible?
  • What current equipment meets the above 'dangerous' standard and who is going to assess it?
    • This list is also needed as a comparative guide to further help define 'dangerous'
  • Still no firm response re planer/thicknesser situation. Is plan still to sell ours and use Philips better one?
  • Workshop sander area needs dust extraction setting up
  • Workshop 'pipe fan' needs investigation, what did Sheep leave in there and can we use it?
  • Wood lathe keeps stalling/slow-moding despite best efforts, and the belt is heavily wearing. Can the motor mount be moved to prevent this?


  • Next working party (JL) moved down as some of the above may feature in it, so discussion should be had first

Notes