Working Parties

From ipswichmakerspace
Revision as of 00:41, 31 December 2017 by Areid (Talk | contribs)

Jump to: navigation, search

Proposed for future working parties


Major Tasks

  • Improve lighting
  • Inventory list to be created
  • Lay a false/drop ceiling to keep heat at a useful height. Materials need discussion and then sourcing.
  • Put the insulation in the workshop somewhere more useful.
  • (Re)wire the kitchen.
  • And presumably some gap filling and then painting would be required.
  • Set up the cabinets once the above are completed.


Lesser Tasks

  • LED light needs installing in workshop on the CNC side.
  • Fix / calibrate 3D printers 3 and 4.
  • Fiddle with the stair light sensor to make it more helpfully ranged. Currently it will operate when you are already halfway up the stairs, or already on the balcony whilst nightblind from leaving the Space.
  • Upgrade front door camera.
  • Acquire and deploy a cooker.
  • The Laser scrap drawer is full of 90% percent useless material, and really needs curating.
  • Workshop dust management system. Cyclone separator and blastboxes are complete, the hosing and gate relays are now in progress. All hoover hose donations are much appreciated.
  • Fix concerningly squeaky workshop hatch.
  • Workshop tool rack. Pegboard based perhaps?
  • Wood storage system, ideally on casters. Currently the idea is for something like the illicit lovechild of these two - to this end we also need more pallets and scrap wood
  • Clean and deploy the drawers somewhere sensible.
  • Sort & assess the supplies / materials / inventables / debris on the workshop racking. Possibly some of these articles could then go in the drawers.
  • We have a brand new toilet and a not-so-new shower tray surplus to requirements. They need extracting, photographing and listing somewhere like Gumtree or Ebay.
  • Fix the doorbell
  • Fix the bench power supply
  • Fix the cold tap in the toilet

Complete

  • Labels for the various anonymous tool boxes (Adam)
  • Rack for storage boxes (Martin)
  • The Workshop Door (Adam & Jon).
  • Fit curtains (Rails, nets and curtains)
  • Fit lock to second room
  • Move the cupboard/contents from the church
  • Run wired network to main tables Network
  • Fit doorbell
  • Install permanent sign
  • Install our own wireless AP (one AP installed, thanks Phil)
  • Work bench for soldering, 3D printing etc, to be built and installed to room one
  • Setup Raspberry Pi work station
  • Projector stand
  • Projector screen